Plan, conduct and report Functional Safety Assessments, from the first checklist response to a signed-off report.
Organization, project and assessments are set up once. The reporting identity and the assessor independence level travel read-only into every plan and report.
The seeded IEC 61511 template covers Stages 1 to 5. Assessors add their own clause-referenced questions where a project needs them.
After hazard & risk assessment and the SRS
After SIS design
After installation, commissioning and validation
Before hazards are introducedAfter operation and maintenance experience
After modification, prior to decommissioning
Starts with an impact analysisA warning, observation or nonconformity raises a finding automatically. Its recommendation raises an action under that finding. Both stay in sync with the checklist.
SIF-104 and SIF-107 have no defined safe state in the SRS (rev C).
Type, clause reference and evidence carried over. Description synced from the assessor finding.
Title and description synced from the recommendation. Owner defaulted from the assignee.
Categories are configurable per organization and carry their own rules: whether they block start-up, and whether closure needs a verifier.
Saving is never blocked. Completeness is checked when the assessment moves to review, and sign-off freezes the record.
review_requires_assessor_findings_completeResponses, findings and the report snapshot can no longer change. Any correction is a formal revision, and the previous revision is preserved.
Hydrogen Unit 4 · SIS upgrade · Northbay Chemicals Ltd
The assessor's judgement stays at the centre. The tool keeps it organised, traceable and ready to sign.